-
Time tracker
- Admin. How to Create a New Task
- Admin. How to Find a Specific Task in a Long List
- Can I see just my own time report instead of the whole company's?
- Employee. How Can I Add a Task?
- Employee. How to See What Tasks You've Been Assigned
- Employee. Why Can't I Find a Certain Project in the Tracker's "Select Project" List?
- How Do I Filter A Report By Employee, Client, Project, Task, Team, Location, or Description?
- How do I filter attendance by employee, team, or location, and change the date range?
- How do I start tracking time on a task?
- How do I switch the whole company between "Clock in/Clock out" and "Task tracker" mode?
- How to Add a New Client, and Why It's Useful
- How to Change the Date Range Being Reported On
- How to Create a New Project (and What Each Field/Toggle Does)
- How to Edit, Deactivate, or Delete a Client (and the Real Difference Between Them)
- How to Export or Print a Report (and What Format You Get)
- How to Filter or Search the Client List
- How to Find, Filter, Edit, Deactivate, or Delete a Project
- How to Stop the Timer in Day Off
- How to View or Change the Date Range of Your Time History in Day Off
- What does the "Billable" icon mean in the Detailed report, and how is it determined?
- What's The Difference Between The Detailed And Summary Reports, And When Should I Use Each?
- What's the Difference Between the Two Time-Logging Modes, and Where Do I Manage This?
Step 1: Open the Tracker
In the left-hand navigation menu, click “Tracker” under the “Time tracking” section. This opens the “Time tracker” page with a text field, dropdowns, a running clock, and a “Start timer” button.
Step 2: Describe what you’re working on (optional)
In the “What are you working on?” field, you can type a short description of the work you’re about to log.
Step 3: Select a project
Click the “Select project” dropdown and choose the relevant project from the list (you can also use the search box to find it quickly). This step is mandatory: a time entry cannot be saved without a selected project, so the timer setup is incomplete until a project is chosen.
Step 4: Select a task
Once a project is chosen, the “Select task” dropdown becomes active. Pick an existing task tied to that project, or click “Add task” if the task you need doesn’t exist yet. If the project has no tasks set up, you can still proceed since the task field is not strictly required, but the project is.
Step 5: Start the timer
Click the green “Start timer” button. The clock will begin counting up in real time (hh:mm:ss), and the entry will appear in your tracking history for that day once you stop it.
Step 6: Stop tracking
When you’re done, click the same button (now showing a stop icon) to end the timer. The completed entry, with its project, task, description, and duration, will be saved to your History list below.
Remember: no matter how you start the process, Day Off will block saving the entry until a project has been selected, so make that your first choice before starting the timer.