-
Time tracker
- Admin. How to Create a New Task
- Admin. How to Find a Specific Task in a Long List
- Can I see just my own time report instead of the whole company's?
- Employee. How Can I Add a Task?
- Employee. How to See What Tasks You've Been Assigned
- Employee. Why Can't I Find a Certain Project in the Tracker's "Select Project" List?
- How Do I Filter A Report By Employee, Client, Project, Task, Team, Location, or Description?
- How do I filter attendance by employee, team, or location, and change the date range?
- How do I start tracking time on a task?
- How do I switch the whole company between "Clock in/Clock out" and "Task tracker" mode?
- How to Add a New Client, and Why It's Useful
- How to Change the Date Range Being Reported On
- How to Create a New Project (and What Each Field/Toggle Does)
- How to Edit, Deactivate, or Delete a Client (and the Real Difference Between Them)
- How to Export or Print a Report (and What Format You Get)
- How to Filter or Search the Client List
- How to Find, Filter, Edit, Deactivate, or Delete a Project
- How to Stop the Timer in Day Off
- How to View or Change the Date Range of Your Time History in Day Off
- What does the "Billable" icon mean in the Detailed report, and how is it determined?
- What's The Difference Between The Detailed And Summary Reports, And When Should I Use Each?
- What's the Difference Between the Two Time-Logging Modes, and Where Do I Manage This?
Step 1: Open Task management
In the left-hand menu, click “Task management” under the “Time tracking” section. This opens the “Tasks” page, which lists every existing task along with filters for Task name, Project, and Assignee.
Step 2: Click “Add new”
Click the pink “+ Add new” button in the top right corner of the Tasks page. This opens the “Add new task” dialog.
Step 3: Fill in the task details
In the dialog, type a name for the task in the “Task name” field. Then use the “Project” dropdown to choose which project the task belongs to, this is a required field, since every task must be linked to a project. You can optionally assign the task to a specific employee using the “Assignee” dropdown, and optionally set an “Estimate” in hours to indicate how long the task is expected to take.
Step 4: Save the task
Click the pink “Save” button to create the task. Once saved, it will appear in the Tasks list and become available for employees to select from the “Select task” dropdown in the Tracker when they choose that same project.
Alternative route: from a specific project
You can also create a task directly from within a project. Go to “Settings,” click the “Projects” card, then click on the specific project’s name to open its detail page. There, click “+ Add task” in the top right, this opens the same dialog, but with the project field already fixed to that project, so you only need to enter the task name (and optionally an assignee and estimate).
Either way, remember that a task cannot exist without being linked to a project, so make sure the correct project is selected before saving.